A City of Miami window permit goes through the city's own Building Department, not through Miami-Dade County's permit portal. You apply online through the city's iBuild platform and upload product approvals and an opening schedule through ProjectDox. The residential permit fee runs 0.50% of the job's construction cost with a $110 minimum, under the fee schedule the City Commission adopted in April 2026. Inspections and the final closeout run through iBuild as well.

That first sentence resolves the mistake we see most often. A "Miami, FL" mailing address usually does not mean the City of Miami: most homes with Miami addresses sit in unincorporated Miami-Dade or in another municipality, and each of those runs its own permitting. File in the wrong system and you lose days before anyone tells you. We pull window and door permits across Miami-Dade every week, and confirming jurisdiction is step one on every job.

Here is the full process for homes inside the city limits, start to finish.

The City of Miami Window Permit Process, Step by Step

Step Where it happens What to do
1. Confirm the city has jurisdiction Miami-Dade Property Appraiser search Pull up the property record and check which municipality taxes the parcel
2. Create an iBuild account City of Miami iBuild portal Name, email, and password; the account tracks everything that follows
3. Start the application iBuild Window/door replacement under a building permit, with the estimated construction cost and the contractor of record
4. Upload documents ProjectDox Opening schedule, product NOAs, and plans, with the upper-right corner of each sheet left blank for the city's stamp
5. Plan review iBuild / ProjectDox City disciplines review in parallel; respond to comments and upload corrections
6. Pay fees and pull the permit iBuild 0.50% of job cost ($110 minimum) plus application fee and surcharges
7. Record a Notice of Commencement County Clerk Required before the first inspection on jobs over $2,500 (s. 713.13, Florida Statutes)
8. Install and inspect iBuild inspections menu Request inspections up to five days out; the final inspection closes the permit

A Miami Address Is Not Always a City of Miami Permit

The City of Miami is one municipality inside Miami-Dade County. The county's building department issues permits for unincorporated areas; the city issues its own, as do Miami Beach, Coral Gables, Hialeah, Doral, and the rest. Kendall, Westchester, and huge stretches of "Miami" addresses are unincorporated county territory, while Little Havana, Coconut Grove, Flagami, and downtown belong to the city.

The property record settles it in under a minute. Search the address on the Miami-Dade Property Appraiser site and read the municipality line: "Miami" means the city's iBuild system, anything else means a different building department. We cover the county's own application process separately; for product rules and county-wide context, our Miami-Dade impact window page is the place to start.

One thing stays county-level no matter where you permit: product approvals. Miami-Dade Product Control issues the Notices of Acceptance that the city's plan reviewers check, so the approval paperwork looks the same on a city job and a county job. Only the permit office changes.

What the City of Miami Asks For in a Window Permit Application

The iBuild application itself is short: the property, a description of the work, the estimated construction cost including labor and materials, and the contractor pulling the permit. The documents behind it carry the weight.

Product approvals. Every window and door needs a current Miami-Dade NOA or a Florida Product Approval rated for the High-Velocity Hurricane Zone, because the entire city sits inside the HVHZ. The approval has to match the exact product configuration being installed, not just the brand and series. Our guide to Miami-Dade HVHZ requirements walks through what those product rules demand.

Opening schedule. This is the document plan reviewers spend the most time on: a line for every opening showing its size, the product going in, the design pressure it is rated for, and the anchoring detail pulled from the NOA's installation drawings. On a straightforward replacement, the opening schedule plus the NOAs often make up the entire plan set.

Upload format. Drawings go in through ProjectDox, the document side of the city's ePlan system. The city stamps approved plans in the upper-right corner of each sheet, so that corner must stay blank: a 2x2 inch area on letter-size pages, up to 4.5x4.5 inches on 24x36 sheets. Plans uploaded with a title block in that corner come back as corrections.

Once submitted, the review runs in parallel across city disciplines, and you can watch each one's status in iBuild. Corrections cost time more than money, though after the second review cycle the city charges $56 per discipline for re-works.

City of Miami Window Permit Fees

The city charges residential building permits as a percentage of job value rather than per window. The current schedule was adopted by Resolution R-26-0200 on April 23, 2026, and posted on the city's fee schedule page. Here is how it lands on a typical whole-home replacement:

Line item Basis On a $30,000 job
City building permit fee 0.50% of estimated construction cost, $110 minimum $150
Application fee Flat, non-refundable, all permits $40
City solid waste surcharge $0.22 per $100 of cost (min $26, max $600) $66
Miami-Dade code compliance surcharge $0.60 per $1,000 of job value $18
State of Florida surcharges 2.5% of the permit fee, $4 minimum $4
Total ~$278

Small jobs get a break: work valued under $2,500 pays a flat $45 base fee. The city collects part of the permit fee at submittal as a non-refundable up-front charge, credited toward the total at issuance.

By South Florida standards, the city's 0.50% rate is on the low end for a value-based schedule. Miami Beach charges 1.7% of job value, Coral Gables 2.0%, and Doral 2.5%, so an identical $30,000 contract can carry a permit bill three to five times higher a few miles away. Our statewide guide to impact window permit costs compares those schedules county by county.

The expensive mistake is skipping the permit. Work started without one pays a $110 after-the-fact base fee plus double the normal permit fee on homestead residential property, and four times the normal fee on everything else.

Inspections Run Through iBuild Too

Once the permit is issued and the windows are in, the permit holder requests inspections through iBuild's inspections menu. Requests can go in up to five days ahead, and inspections usually happen the day after the request. On inspection day, iBuild shows the inspector's route and roughly when they will arrive.

The inspector passes or fails the work on site. Corrections mean fixing the items and requesting the inspection again, and a $57 re-inspection fee applies when the site was not ready: work incomplete, approved plans not on site, or no access. A window replacement under a single building permit closes out with the final inspection; that final is what turns "permit issued" into "permit finaled" in the public record, which matters the day the house is sold.

Who requests matters. The permit holder for each permit requests its inspections, so if your contractor pulled the permit, they schedule and attend. An owner-builder requests the building inspection personally.

How to Look Up Permit History for a Miami Address

Every permit the city issues is public record, searchable through iBuild's Global Inquiry with any one of three identifiers: the process number, the property address, or the 13-digit county folio number. The record shows the permit type, its status, the declared construction cost, issue and expiration dates, fees, and the inspection history down to individual results.

That lookup answers practical questions. Buying a house with newer windows and no matching permit tells you the openings may need legalization. Checking your own address confirms your contractor actually pulled the permit before mounting frames. And a finaled permit from a prior owner is worth keeping for insurance and resale.

Next Steps

If you are planning a window or door replacement inside the city limits, we handle the City of Miami permit end to end as part of the install: the jurisdiction check, the opening schedule, the NOA package, the iBuild filing, and every inspection through the final. Request a free estimate and we will price the project with the permit work included.